Completed Commercial electrical projects
We are thrilled to have been involved with these quality projects, built to last, and designed for modern living.
Te Reiputa
1 Reiputa Lane, Mount Wellington, Auckland
Completed: May 2026
Simplicity Living Te Reiputa: 297 Apartments
Simplicity Living’s Te Reiputa is a 297-apartment Build-to-Rent development in Mount Wellington, Auckland, comprising a mix of one, two and three-bedroom homes with convenient access to local amenities, public transport and green spaces.
X Electrix delivered the full electrical services package across the development, including power distribution, apartment and communal lighting, communications infrastructure, Salto access control, intercom systems, and MATV installation.
The development features a rooftop terrace and resident lounge, shared workspaces and a resident pavilion, secure parcel lockers, solar panels and rainwater harvesting systems, EV charging facilities, and dedicated bicycle and motorbike storage.
Rangeview Terrace
Rangeview Terrace, Mt Albert, Auckland
Completed: May 2024
NZ Living Rangeview: 51 Apartments
NZ Living Rangeview is a 51-apartment development in Mt Albert, Auckland, comprising a mix of one, two and three-bedroom homes constructed across two stages.
X Electrix delivered the electrical and mechanical services across the development, including power distribution, apartment and communal lighting, ventilation systems, communications infrastructure, EV charging installation, exterior lighting, access control, air conditioning, and security systems.
Kainga Ora Oranga
State Ave, Onehunga, Auckland
Completion: October 2023
NZ Living Oranga: 73 Apartments
This development of 73 apartments, in one, two and three bedroom configurations, was built in 2 stages. Works completed by X Electrix included the distribution, communal power and lighting, apartment power and lighting, ventilation, communications wiring, EV charger installation, exterior lighting, access control, air conditioning, and the installation of the MATV system.
Kupenga
Pilkington Rd & Torino St, Point England, Auckland
Completed: July 2023
NZ Living Kupenga: 132 Apartments
NZ Living Kupenga is a 132-apartment development in Point England, Auckland, comprising a mix of one, two and three-bedroom homes constructed across two stages.
X Electrix delivered the electrical and mechanical services across the development, including power distribution, apartment and communal lighting, ventilation systems, communications infrastructure, EV charging installation, exterior lighting, access control, air conditioning, and MATV installation.
Lake Road
Lake Road Apartments, Northcote, Auckland
NZ Living: 30 Apartments
NZ Living Lake Road is a 30-apartment development in Northcote, Auckland, comprising a mix of studio and two-bedroom homes. The project was delivered concurrently with the nearby Awataha Street apartment development.
X Electrix delivered the electrical services across the development, including power distribution, apartment and communal lighting, communications infrastructure, access control, air conditioning, and MATV installation. The project was completed over a nine-month construction programme.
Awataha
Awataha Apartments, Northcote, Auckland
NZ Living: 27 Apartments
NZ Living Awataha is a 27-apartment development in Northcote, Auckland, comprising a mix of studio and two-bedroom homes. The project was delivered concurrently with the nearby Lake Road apartment development.
X Electrix delivered the electrical services across the development, including power distribution, apartment and communal lighting, communications infrastructure, access control, air conditioning, and MATV installation. The project was completed over a nine-month construction programme.
Fraser Ave
Fraser Ave Apartments, Northcote, Auckland
NZ Living: 102 Apartments
NZ Living Fraser Ave is a 102-apartment development in Northcote, Auckland, comprising a mix of studio through to three-bedroom homes.
X Electrix delivered the electrical services across the development, including power distribution, apartment and communal lighting, communications infrastructure, access control, and MATV installation. The project was completed over a 12-month construction programme.
